Log Entry: Site-96 Anomaly Report
This documentation details the ongoing anomalous activity detected at Site-96 on date. At approximately time, multiple agents reported experiencing strange sensory distortions. Early analysis suggest the anomaly is centered around the perimeter fence. A team of containment specialists has been dispatched to Site-96 and attempts at containment are underway. Further details will be provided as they become available.
Secure Containment Protocols: Site-96 Update
Recent incidents at Site-96 have necessitated a review and revision of existing containment protocols. The primary concern stems from the anomalous activity exhibited by SCP-number. This shift in behavior presents a potential threat to both personnel and the surrounding environment. To mitigate this risk, several measures have been introduced. A new containment cell, constructed with upgraded materials, has been deployed for SCP-number. Additionally, personnel rotations will be modified to minimize exposure and potential exposure. All personnel are reminded to adhere strictly to the revised protocols outlined in document number.
- Specific protocol changes remain classified pending further analysis.
Log Log: Site 96 - Personnel Classified
Subject Coded designations remain heavily Redacted. Initial Deployment records for Agent Jones, designated as Task Force Bravo lead, are Fragmented. Evidence suggests a potential Compromise during the initial Encounter with SCP-96. Further analysis of recovered data is required to determine the full extent of the Event.
- Supplemental log entries are currently Pending for declassification review.
- Site security protocols Were/Are/Have Been implemented following the incident, including but not limited to, increased perimeter Monitoring, access restrictions, and mandatory De-briefings.
The primary objective remains containment of SCP-96 and mitigation of any Secondary effects.
Log Entry: Site-96 Breach Protocol Activated
At estimated hour:minute hours on date, a containment breach was registered at Site-96. The breach involved an unidentified entity of unknown origin and potential hazard rating. All personnel have been alerted to execute the established breach protocol, designated as "Red Sequence". Preliminary reports indicate heavy resistance from SCP-number and significant facility damage. A full reconnaissance is underway to determine the extent of the breach and the status of all personnel. Further updates will be relayed as they become available.
Designated Termination Procedures
This document outlines the protocol for authorizing termination actions within Site-96. Access to this information is strictly limited to designated personnel as listed below. Any unauthorized access or dissemination of this document will result in immediate termination.
- Authorized Staff:
- Director of Site-96
- Agent [REDACTED]
- External Authorizations
All terminations must be justified website in writing and adhere to the strict protocols outlined in Annex 1: Site-96 Operational Directive|Appendix B: Security Clearance Levels}. Failure to comply with these regulations may result in disciplinary action.
Application Denied
Following thorough review of the filed request for release pertaining to Site-96, the Approving Committee has issued a formal rejection. The reasons behind this decision are redacted and will not be shared at this time. Furthermore, any future requests regarding Site-96 will be subject to the same rigorous scrutiny and may result in consistent outcomes.
- Kindly refrain from seeking any unapproved access to information concerning Site-96.
- All breaches of this directive will be met with disciplinary action.